How to apply work permit in NYC

How to apply work permit in NYC

lizrabbit
lizrabbit
3329 浏览

The majority of construction requires a Department of Buildings permit. Most often, a New York State licensed Professional Engineer (PE) or Registered Architect (RA) must file plans and pull permits before work begins.

There are many permit types, such as construction, boiler, elevator, and plumbing. The primary permit applications are: New Building (NB) and Alterations Type-1, 2 and 3:

NB: Construction of new structures
ALT1: Major alterations that will change use, egress or occupancy
ALT2: Multiple types of work, not affecting use, egress or occupancy
ALT3: One type of minor work, not affecting use, egress or occupancy

A New York State licensed Professional Engineer (PE) or Registered Architect (RA) must submit construction plans to obtain a permit. A Department plan examiner will review the plans for any legal/zoning objections. When objections are satisfied, the Department will approve the application. A licensed PE or RA may also certify that plans conform to all applicable laws.

以上内容是来至于房屋局官网.

我是在美国学习会计,最终毕业于金融专业. 我做了半年会计, 实在无趣, 就进入建筑行业, 我较向往的一个方向. 两年多,我大概弄清纽约建筑行业申请流程.现在依然做着建筑工程师的助理工作,边学习边工作.

纽约市打击违规改建房屋风气,实行了非常严厉的高额罚金.高罚金往往比申请费用更高.现在大多数的工程包工头也不希望承担被处罚的风险.如何合法的去改装自己的房子, 那了解纽约的建筑法规十分重要.

 



部分屋主抱着侥幸的心理, 但是被房屋局的检查官抓到, 仅仅一张work without permit的罚款是$2500. 若是比较严厉的检查官至少3-4张罚单,那罚款就是万把块. 言归正传,在纽约申请装修工作许可证(work permit),大多数需要有执照的建筑师R.A.或工程师P.E.画图后, 递交申请材料, 等房屋局的批图官审核批准了图纸, 然后有执照的工程包工头(contractor)才能递交表格申请到work permit.

另外, 部分水电工不需要画图,由专业有执照的水电工递交申请就可拿到水电work permit.只是简单的介绍流程, 图纸规划是否符合纽约市的房屋法律,请联系专业人士.